The Ratle Hydroelectric project
Relevance: Prelims/Mains: G.S Paper II: International & G.S paper III: Indian Economy
The Ratle Hydroelectric project
It is a run-of-the-river hydroelectric power station currently under construction on the Chenab River, downstream of the village of Ratle, near Drabshalla in Kishtwar district of Jammu and Kashmir.
Kiru hydro-electric project
It is a run-of-river scheme is located, in Kishtwar district of J&K State and is about 40 kms from Kishtwar. The Kiru H E Project of 624 MW installed capacity is proposed on river Chenab and envisages construction of 135 m Dam.
Pakal Dul (Drangdhuran)
Hydroelectric Project
It is a reservoir based scheme proposed on river Marusudar, the main right bank tributary of river Chenab in Kishtwar Tehsil of Doda District in Jammu & Kashmir.
Kishanganga Power station (3x110MW)
It is located on Kishanganga River, a tributary of river Jhelum in Bandipora District of Jammu & Kashmir.
Dulhasti power station
It is run-of-the-river with pondage scheme with an installed capacity of 390 MW (3 X 130MW) to harness the hydropower potential of river Chenab. It is located in Kishtwar district of Jammu & Kashmir.
Salal power station
It is run-of-the-river scheme with an installed capacity of 690 MW (Stage-I of 3 x115 MW & Stage-II 3 X 115 MW) to harnesses the Hydropower potential of river Chenab. It is located in Reasi district of Jammu & Kashmir.
Uri hydroelectric plant
It is a run-of-the-river power project on the Jhelum River in the Uri area of Baramullah District, Jammu and Kashmir.
For more such notes, Articles, News & Views Join our Telegram Channel.
Click the link below to see the details about the UPSC –Civils courses offered by Triumph IAS. https://triumphias.com/pages-all-courses.php