{"id":9521,"date":"2020-08-13T17:26:26","date_gmt":"2020-08-13T11:56:26","guid":{"rendered":"https:\/\/triumphias.com\/blog\/?p=9521"},"modified":"2023-04-07T13:31:16","modified_gmt":"2023-04-07T08:01:16","slug":"the-ratle-hydroelectric-project","status":"publish","type":"post","link":"https:\/\/triumphias.com\/blog\/the-ratle-hydroelectric-project\/","title":{"rendered":"The\u00a0Ratle Hydroelectric\u00a0project"},"content":{"rendered":"<h1>The\u00a0Ratle Hydroelectric\u00a0project<\/h1>\n<p><span style=\"color: #0000ff;\"><strong>Relevance: Prelims\/Mains: G.S Paper II: International &amp; G.S paper III: Indian Economy<\/strong><\/span><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.power-technology.com\/wp-content\/uploads\/sites\/7\/2017\/09\/1l-image-90.jpg\" alt=\"Ratle Hydroelectric Power Plant, Jammu and Kashmir - Power Technology | Energy News and Market Analysis\" \/><\/p>\n<p><span style=\"color: #000000;\">The\u00a0<span style=\"color: #ff0000;\"><strong>Ratle Hydroelectric<\/strong>\u00a0<strong>project<\/strong><\/span><\/span><\/p>\n<p>It is a run-of-the-river hydroelectric power station currently under construction on the\u00a0<strong>Chenab River<\/strong>, downstream of the village of Ratle, near Drabshalla in Kishtwar district of Jammu and Kashmir.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>Kiru hydro-electric project<\/strong><\/span><\/p>\n<p>It is a run-of-river scheme is located, in Kishtwar district of J&amp;K State and is about 40 kms from Kishtwar. The Kiru H E Project of 624 MW installed capacity is proposed on\u00a0<strong>river Chenab<\/strong>\u00a0and envisages construction of 135 m Dam.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/vajiramandravi.s3.us-east-1.amazonaws.com\/media\/2020\/8\/12\/9\/24\/44\/chenab.jpg\" alt=\"India has refused a request by Pakistan to hold a meeting on issues around the Indus Water Treaty (IWT) esp. to ...\" \/><\/p>\n<p><span style=\"color: #ff0000;\"><strong>Pakal Dul<\/strong>\u00a0(Drangdhuran)\u00a0<\/span><\/p>\n<p><span style=\"color: #ff0000;\"><strong>Hydroelectric Project<\/strong><\/span><\/p>\n<p>It is a reservoir based scheme proposed on river\u00a0<strong>Marusudar, the main right bank tributary of river Chenab<\/strong>\u00a0in Kishtwar Tehsil of Doda District in Jammu &amp; Kashmir.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>Kishanganga Power station (3x110MW)<\/strong><\/span><\/p>\n<p>It is located on Kishanganga River, a tributary of river Jhelum in Bandipora District of Jammu &amp; Kashmir.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>Dulhasti power station<\/strong><\/span><\/p>\n<p>It is run-of-the-river with pondage scheme with an installed capacity of 390 MW (3 X 130MW) to harness the hydropower potential of river Chenab. It is located in Kishtwar district of Jammu &amp; Kashmir.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>Salal power station<\/strong><\/span><\/p>\n<p>It is run-of-the-river scheme with an installed capacity of 690 MW (Stage-I of 3 x115 MW &amp; Stage-II 3 X 115 MW) to harnesses the Hydropower potential of river Chenab. It is located in Reasi district of Jammu &amp; Kashmir.<\/p>\n<p><span style=\"color: #ff0000;\"><strong>Uri hydroelectric plant<\/strong><\/span><\/p>\n<p>It is a run-of-the-river power project on the Jhelum River in the Uri area of Baramullah District, Jammu and Kashmir.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/i2.wp.com\/currentaffairs.gktoday.in\/wp-content\/uploads\/2018\/09\/Indus-Waters-Treaty-2.jpg?resize=640%2C474&amp;ssl=1\" alt=\"Indus Waters Treaty : Latest Current Affairs and News - Current Affairs Today\" \/><\/p>\n<p><span style=\"color: #0000ff;\"><strong>For more such notes, Articles, News &amp; Views Join our Telegram Channel.<\/strong><\/span><\/p>\n<p><a title=\"Telegram Link\" href=\"https:\/\/t.me\/triumphias\" target=\"_blank\"><span style=\"color: #ff0000;\"><strong>https:\/\/t.me\/triumphias<\/strong><\/span><\/a><\/p>\n<p><span style=\"color: #0000ff;\"><strong>Click the link below to see the details about the UPSC \u2013Civils courses offered by Triumph IAS.<\/strong> <\/span><span style=\"color: #ff0000;\"><strong><a style=\"color: #ff0000;\" title=\"Courses available\" href=\"https:\/\/triumphias.com\/pages-all-courses.php\">https:\/\/triumphias.com\/pages-all-courses.php<\/a><\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The\u00a0Ratle Hydroelectric\u00a0project Relevance: Prelims\/Mains: G.S Paper II: International &amp; G.S paper III: Indian Economy The\u00a0Ratle Hydroelectric\u00a0project It is a run-of-the-river<\/p>\n","protected":false},"author":1,"featured_media":6631,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[123,18,42],"tags":[2506,2510,2515,2516,2513,2507,2509,2508,2505,2514,2511,392,2512],"class_list":["post-9521","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-current-affairs","category-general-studies-ii","category-general-studies-iii-technology-economic-development-bio-diversity-environment-security-and-disaster-management","tag-chenab-river","tag-dulhasti-power-station","tag-hydroelectric-power-station","tag-installed-capacity","tag-jammu-and-kashmir","tag-kiru-hydro-electric-project","tag-kishanganga-power-station","tag-pakal-dul-hydroelectric-project","tag-ratle-hydroelectric-project","tag-run-of-the-river","tag-salal-power-station","tag-union-public-service-commission-upsc","tag-uri-hydroelectric-plant"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/posts\/9521","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/comments?post=9521"}],"version-history":[{"count":3,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/posts\/9521\/revisions"}],"predecessor-version":[{"id":13692,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/posts\/9521\/revisions\/13692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/media\/6631"}],"wp:attachment":[{"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/media?parent=9521"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/categories?post=9521"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/triumphias.com\/blog\/wp-json\/wp\/v2\/tags?post=9521"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}