Prelims: PIB

 

  • New World Bank Project to Support Climate Resilient Agriculture for 125,000 Small holder Farmers in Odisha

The Government of India, Government of Odisha and the World Bank signed a US$165 million loan agreement to support smallholder farmers strengthen the resilience of their production systems as well as diversify and improve the marketing of their produce, for increased income.

The Odisha Integrated Irrigation Project for Climate Resilient Agriculture will be implemented in rural areas vulnerable to droughts and largely dependent on rainfed agriculture. It will benefit about 125,000 smallholder farmer households from 15 districts of Odisha managing 128,000 ha of agricultural land.

The project will strengthen the resilience of smallholder farmers against adverse climate by improving access to resilient seed varieties and production technologies, diversifying towards more climate-resilient crops, and improving access to better water management and irrigation services.

The Government of India is implementing several missions under the National Action Plan on Climate Change, which also extensively leverages adaptation of climate-smart agricultural practices and technologies.

The project in Odisha is among several such initiatives supported by the government in our commitment to achieve the sustainable agriculture-related targets of the SDGs by 2030.

In recent years, climate variability has seriously affected agriculture in Odisha, where farming is largely dominated by farmers with landholdings of less than two hectares.

More and more agricultural areas are coming under the ambit of extreme weather events. Since 2009, the frequency of droughts in the state has increased from 1 in 5 years to 1 in 2 years. Today, about 70 percent of total cultivated area is prone to droughts compared to 40 percent in the 1970s. In fact, since 2013, floods are now devastating areas beyond the traditional flood zone.

Drier areas are projected to become drier, while wetter areas will become wetter. Agriculture is also a major source of Greenhouse Gas (GHG) emissions in Odisha, responsible for about 25 percent of the GHG emissions in the state.

Across Odisha small-scale farmers are bearing the brunt of climate change. Erratic and extreme weather are responsible for declining yields and falling incomes.

At the same time, agriculture is a large contributor to GHG emissions. The project is intended to be a game-changer for the State; creating a more resilient agricultural sector, enhancing food security, increasing farmers’ incomes and reducing the GHG footprint of the sector.

The project will support the rehabilitation of 532 water tanks – expected to irrigate 91,435 ha; promote productivity improvements at the farm level; support farmers to reduce the current emphasis on food grains (especially paddy and wheat) and increase the share of high-value and more nutritious products like fruits and vegetables; and provide marketing support to farmers who are able to generate a marketable surplus.

The project will also support aquaculture in rehabilitated tanks, help farmers access affordable and quality fingerlings, and disseminate improved aquaculture practices and post-harvest management.

Rehabilitating existing tanks will make agriculture more productive and climate-resilient for smallholder farmers.

This project will support the Government of Odisha’s vision to build the resilience of the agriculture sector to climate change, expand cultivable area under assured irrigation and improve water use efficiency.

The $165 million loan from the International Bank for Reconstruction and Development (IBRD), has a 6-year grace period, and a maturity of 24 years.

 

  • India signs the Kartarpur Sahib Corridor Agreement with Pakistan

    The Agreement is intended to facilitate pilgrims to visit Gurudwara Darbar Sahib Kartarpur through Kartarpur Sahib Corridor

India has signed the Agreement with Pakistan today on the modalities for operationalisation of the Kartarpur Sahib Corridor at Zero Point, International Boundary, Dera Baba Nanak.

It is very well known that the Union Cabinet passed a resolution on 22 November 2018 to celebrate the historic occasion of 550th Birth Anniversary of Sri Guru Nanak Devji in a grand and befitting manner, throughout the country and across the globe.

In a landmark decision, the Union Cabinet also approved the building and development of the Kartarpur Sahib Corridor from Dera Baba Nanak to the International Boundary, to facilitate pilgrims from India to visit Gurdwara Darbar Sahib Kartarpur, round the year, in a smooth and easy manner.

With the signing of this Agreement, a formal framework has been laid down for operationalisation of the Kartarpur Sahib Corridor.

The highlights of the Agreement are: –

  • Indian pilgrims of all faiths and persons of Indian origin can use the corridor;
  • The travel will be Visa Free;
  • Pilgrims need to carry only a valid passport;
  • Persons of Indian Origin need to carry OCI card along with the passport of their country;
  • The Corridor is open from dawn to dusk. Pilgrims travelling in the morning will have to return on the same day;
  • The Corridor will be operational throughout the year, except on notified days, to be informed in advance;
  • Pilgrims will have a choice to visit as individuals or in groups, and also to travel on foot;
  • India will send the list of pilgrims to Pakistan 10 days ahead of travel date. Confirmation will be sent to pilgrims 4 days before the travel date;
  • The Pakistan side has assured India to make sufficient provision for ‘Langar’ and distribution of ‘Prasad’;

The main issue that has been a point of discussion is the insistence of Pakistan to levy US Dollars 20 as service charge per pilgrim per visit.

India has consistently urged Pakistan to not levy any fee on the pilgrims. It was stressed time and again, including in the previous three Joint Secretary Level meetings and at the diplomatic level, that this is not in consonance with the religious and spiritual sentiments of Indian pilgrims.

India has shared its deep disappointment with Pakistan for its refusal to waive the fee. However, in the interest of the pilgrims and timely operationalization of the Kartarpur Sahib Corridor before the 550th Prakash Purb, India has agreed to sign the Agreement.

While the Agreement has been signed, Government of India continues to urge this issue with the Government of Pakistan to reconsider its insistence on levying the fee. India remains ready to amend the Agreement accordingly.

India continues to pursue the issue of all-weather connectivity through the corridor. In this context, Government of India has built the bridge on Indian side and a temporary service road as an interim arrangement.

It is expected that Pakistan will fulfil the assurance that it would build the bridge on their side at the earliest.

Provisions made for facilitation of Pilgrims

All the required infrastructure viz., the highway and the Passenger Terminal Building are nearing completion for timely inauguration of the Kartarpur Sahib Corridor.

A robust security architecture has been put in place while facilitating smooth and easy passage of pilgrims.

An Electronic Travel Authorization will also be generated. The pilgrims need to carry Electronic Travel Authorization, along with their passport, when they arrive at the Passenger Terminal Building.

 

  • Chenani Nashari Tunnel renamed after Dr Syama Prasad Mookerjee

    Shri Gadkari says,  This is a fitting tribute to Dr Mookerjee Shri Jitendra Singh calls this a unique moment in Indian history A new road alignment between Delhi and Katra announced

Union Minister for Road Transport & Highways and MSME MoS (I/C) Development of North Eastern Region (DoNER), MoS PMO, Public Grievances & Pensions, Atomic Energy and Space announced renaming of Chenani Nashri Tunnel on NH 44 in Jammu & Kashmir as Dr Syama Prasad Mookerjee Tunnel.

This 9 km tunnel is the longest such state of art tunnel in the country, connecting Udhampur to Ramban in Jammu. Constructed at a cost of Rs 2500 crore, it cuts down 31 km of travel distance and reduces the travel time between the two points by about two hours, in addition to substantial saving in fuel cost.

 

Leave a Reply

Your email address will not be published. Required fields are marked *